Vinton Business Center Master Plan, Rezoning & Infrastructure Design; Roanoke County, VA Project Manager and Lead Engineer for 100 acre industrial park. Work included master planning, rezoning, and designing half a mile of new roadway and improvements to existing roads. Also prepared rough grading plans for parcels within business park and designed regional stormwater management facility. Other elements included water system, sanitary sewer system, erosion & sediment control, storm drainage appurtenances, underground communications ductbank, and construction administration. Also assisted with wetlands mitigation plans, trail network, and proffer preparation. Successfully aided owner with marketing by preparing conceptual plans for prospective businesses.

New Hope Road Industrial Park; Staunton, VA Lead Engineer for 60 acre industrial park. Duties included planimetric layout, roadway design, grading, water, sewer, stormwater conveyance, and two stormwater management ponds.

Dearing Ford Business & Manufacturing Center; Campbell County, VA Lead Engineer for roadway into new industrial park. Duties included planimetric layout, grading, stormwater conveyance, water, and sewer appurtenances.
|
Botetourt-Craig Regional Jail; Fincastle, VA Project Manager and Lead Engineer - Site development plan for 4.1 acre / 185 bed Regional Jail. Design included parking lot layout, grading, handicap access, water, sewer conveyance, stormwater conveyance, erosion & sediment control, underground stormwater management facility, and construction administration. Site was extremely compact and required extra attention to detail, as well as provisions for future expansion. 
Special Purpose Housing; Blacksburg, VA Lead Engineer for project to construct four new buildings on 12 acres to house eight fraternities and sororities on the campus of Virginia Polytechnic Institute and State University. Duties included access road design, site grading, storm drain, stormwater management, water quality improvement, sanitary sewer system, water system, parking/amenity layouts, and construction administration.

Municipal Solid Waste Transfer Station; Martinsville, VA Lead Engineer for 50,000 SF multi-level solid waste transfer station. Project design included a pre-engineered building with tipping floor and loading areas underneath for two transfer trailers. Responsible for all civil design including scale house, office, access roads with curb and gutter, 2,000' water connection to City system, sewage holding tank, storm drain design, and erosion / sediment control plan.

Welcome Center; Martinsville, VA Lead Engineer for 1.5 acre welcome center. Work included planimetric layout, grading, stormwater conveyance, sanitary sewer, water system design, and erosion / sediment control.

Virginia State Police Area Offices; Chatham and Clifton Forge, VA Project Manager and Lead Engineer for planimetric layout, grading, and utilities including septic tank / drain field, stormwater management, and erosion sediment control for two separate one acre State Police Area Offices.
|
TASC at Westfields Phases Iⅈ Fairfax County, VA Lead Engineer - Site development for 22 acre office complex. Responsibilities included planimetric layout, site grading, utilities, stormwater management pond, erosion and sediment control plans and dam breach analysis/flood routing. 
Woodlands at Athens; Athens, GA Lead Engineer for 33 acre residential site development near the University of Georgia. Duties included complete design of 5,400 feet of roadway and grading of entire site which contained over 120 lots. Other design elements included storm drainage network, sanitary sewer system, water system, and recreational facilities.

Cardinal Insulated Glass; Roanoke County, VA Lead Engineer for site planning, planimetric layout, stormwater conveyance, sanitary sewer, and water system for 25-acres industrial site with a 600,000 square foot manufacturing facility. Low Impact Development design concepts were used where appropriate. Responsibilities also included construction administration.

Martin Bros. Contractors; Roanoke, VA Project Manager and Lead Engineer for 3 acre parcel developed for office and light industrial use. Duties included planimentric layout, grading, utilities, and stormwater management waiver. Site was arranged to allow future building expansion.

Asthma and Allergy Center; Roanoke, VA Lead Engineer for 1-acre site development including planning, grading, parking layout, stormwater conveyance, sanitary sewer, water, and underground stormwater detention. The underground stormwater detention facility was unique in Roanoke because it did not have a gravity outfall. The stormwater was pumped from the facility at a rate equal to the predeveloped flow rate. Follow-up visits have shown the underground stormwater management facility to be functioning perfectly.

Premium Distributors; Fairfax County, VA Lead Engineer for design of 8 acre beverage distribution center. Responsibilities included planimetric layout, site grading, utilities, and erosion & sediment control plan.

First Union Banks; Falls Church, Vienna, Manassas, Fairfax, Arlington, Alexandria & Annandale, VA Lead Engineer for upgrading existing banks and site development for new branches. Work included several complete site plans and rezoning applications necessitated by adding drive-through banking windows. Most sites were small and it was critical to maximize their utility.
|